lJackson and co ltd

KB4 Aluminium Military Bridging



ID: 595 Ref MOD: 11578
Location: DN10 6ET, Doncaster, The UK



KB4 Aluminium Military Bridging


Units Available:   6

NEW
Mileage Hrs/Kms: 0
Year of Manufacture:
Export Requirements:  

The price: P.O.A.
KB4 Aluminium Military Bridging
KB4 Swedish manufactured emergency bridging. Aluminium construction. High quality. Approx. 4 hrs per bridge erection time. Does not require any crane facilities. These bridges are counter balanced upon erection with only manpower to assemble.

This bridging equipment is in as new condition the complete kit enables you to build a 26 meter or 15 meter bridge with varying load capacities between 25,ooo kg and 50,000 kg. Erection time from start to finish is 4 hours and requires no specialist tools or machinery. The bridges can also be interlinked and cross linked to give any variation in width length up to 26 meter x 26 meter.

Specification KB4 Aluminium Bridging

Width 3 meter
Max reach 26 meter
Max load 25,000 kg
Construction type hole & peg
Material Aluminium alloy
Construction time 4 hours
The approx weight of the KB4 is 10,000 kgs


The bridge has the following capacities:

50,000kg`s @ 15metres
14,000kg`s @ 24 metres

Ex reserve stock.
Unissued.




WWW.ARMY-UK.COM ©

Materials and specifications are subject to change without notice.
Featured machines in photos may include additional equipment. The specification do not necessarily show the standard version of the machine.
Ask our manager for available options.
Yard, repair shops and office Address: (BY APPOINTMENT ONLY)

The Rocket Site, Misson, Nr. Bawtry, Doncaster, United Kingdom
09.00 - 17.00 hrs Monday - Friday
Not available on Saturday's or Sunday's

Click for call +44 (0)1302 770485 London Time (GMT) 09.00 - 17.00 hrs Monday - Friday only
Sales & Marketing: David Vitalio, Michael Thompson E-mail: ku.oc.kuymra@yriuqne